• Home
  • News
    • News
    • Exhibition dates
  • Company
  • Products & services
    • Shear connectors
    • Welding studs
    • Stud welding units
      • Drawn arc
      • Drawn arc inverter
      • Capacitor discharge
    • Stud welding guns
      • Drawn arc
      • Capacitor discharge
    • Automation
      • CNC stud welding machines
      • Tabletop stud welding machine MAS-04
      • Automatic welding heads
      • Automatic stud feeder VBZ
      • Automatic stud feeder RBZ
      • Automatic welding guns
    • Accessories and wear parts
      • Catalogue accessories and wear parts for drawn arc stud welding guns
      • Catalogue accessories and wear parts for capacitor discharge stud welding guns
      • Catalogue accessories and wear parts automation
      • Catalogue accessories and wear parts general
      • Adapter box PRO-SPLIT
      • Welding parameter memory PRO-x and read-out/analysis software PRO-xDataLog
      • Handling arm POWERFLEX
    • DUOFIX for mounting of heat cost allocators
    • ISOFIX/ISOFIXaccu – for welding cupped head pins and insulations nails
    • Stud welding in shipbuilding
    • Stud welding in refractory construction
    • Application-related consulting and training
    • Maintenance and repair
    • Rental equipment
    • Contract welding
    • Design software for shear connectors
  • Application Examples
    • Shear connectors
    • Drawn arc stud welding
    • Capacitor discharge stud welding
    • CNC stud welding machines
    • Tabletop stud welding machines
    • Special welding studs
    • Special solutions
    • Stud welding with robot
  • Certificates & Approvals
  • Contact
    • Locations
    • Application technology and technological consulting
    • Technical field service
  • Download
  • deutsch
  • english
  • italiano
  • español
  • français
  • росси́йский
Bolte GmbHBolte Bolzenschweißen

Expanded European Technical Approval ETA-11/0120 for shear connectors made of steel (e.g. S235J2+C470) and of stainless steel (e.g. 1.4301)

(30/11/2021) The European Technical Approval ETA-11/0120 for our SB shear connectors (Product family: Steel plate with cast-in anchors), which was issued to us for the first time in 2011, now was substantially expanded by the DIBt (German Institute for Civil Engineering):

Read more ...

Completion of our new building at the location Gevelsberg

(25/10/2021) After some delays caused by the effects of the coronavirus to the economy our new building at the location Flurstrasse in Gevelsberg was finally completed and can be used, only some pavement works as well as the new perimeter fence and signage are still under construction.

Read more ...

CNC stud welding machine V 100150 (working area: 1000 x 1500 x 250 mm)

(15/10/2021) The machine V 100150 has a robust, welded steel machine frame with ten ceramic stop pins on the X and Y zero lines, the axes are driven through dynamic servo motors.

Read more ...

New series PRO-I, PRO-D and PRO-S units - presentation in DER PRAKTIKER

(28/09/2021) The advantages which are offered by our new series PRO-I, PRO-D and PRO-S units to the user for his daily work, now were also extensively presented in the technical press. In the September edition of the DVS professional journal DER PRAKTIKER a six-page article about the new units was published.

Read more ...

Modern equipment for SLV Duisburg

(20/09/2021) The GSI mbH branch SLV Duisburg regularly organises special training courses for stud welding and also demonstrates this welding process within the education for welding specialists and welding engineers. SLV Duisburg is pleased to receive one of the most modern stud welding systems of Bolte GmbH that was handed over today.

Read more ...

Delivery of our new multi-stage press

(15/09/2021) Today early in the morning our new multi-stage press was delivered.

Read more ...

More Articles ...

  1. New generation of units with extensive process monitoring and maximum usability
  2. Merger of SB Produktion GmbH with Bolte GmbH on July 1, 2021
  3. Dipl.-Ing. (TU)/SFI (IWE) Rainer Trillmich – welding engineer for application technology and technological consulting
  4. New: Welding parameter memory and read-out/analysis software for stud welding units
  5. Start of construction work for another hall at our location in Gevelsberg

Page 7 of 23

  • Start
  • Prev
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • Next
  • End

Direct contact

Telephone

Gevelsberg

+49 (0)2332 55106-0

Dachau

+49 (0)8131 5159-0

E-Mail

info[at]bolte.gmbh

Contact form

Exhibition dates

Schweissen & Schneiden

Sept 15 -19, 2025
Essen, Germany

10th Schweisstec

Oct 21 - 24, 2025
Stuttgart, Germany

Imprint

Data privacy

General Terms and Conditions of Sale and Delivery

General Terms and Conditions of Purchase

  • Shear connectors
  • Welding studs
  • Stud welding units
  • Stud welding guns
  • Automation
  • Accessories and wear parts
  • DUOFIX for mounting of heat cost allocators
  • ISOFIX/ISOFIXaccu – for welding cupped head pins and insulations nails
  • Stud welding in shipbuilding
  • Stud welding in refractory construction
  • Application-related consulting and training
  • Maintenance and repair
  • Rental equipment
  • Contract welding
  • Design software for shear connectors

Bolte GmbH

Flurstraße 25
D-58285 Gevelsberg

Tel: +49 (0)2332 55106-0
Fax: +49 (0)2332 55106-11

Ohmstraße 3
D-85221 Dachau

Tel: +49 (0)8131 5159-0
Fax: +49 (0)8131 5159-11

E-Mail:
info[at]bolte.gmbh

© Copyright Bolte GmbH - All rights reserved